Just a few of the projects that took place this summer. The window is in on the North side of the studio and the wall is re-sided all the way down. We also repaired the roof on that building and the garage as the wind always tries to remove the shingles. Adrian and Mom put in some work on the flower beds which make the place look great while it was Adrian and Dad that completed the walkway from the studio to the house.
Mom waits patiently in my car for me to finish with the photos. I'll be on the bike again as I look forward to another ride.



0 Comments:
Post a Comment
Links to this post:
Create a Link
<< Home